top of page

Balcony & Stair Replacement

A Safer, Code-Compliant Outdoor Access Solution

transparent-complete

Completed 2026

Screenshot 2026-07-09 at 10.49.44 PM.png

PROJECT TYPE

Structural repair & exterior renovation

Screenshot 2026-07-09 at 10.50.51 PM.png

CHALLENGE

Deteriorated stars & undersized access

Screenshot 2026-07-09 at 10.51.16 PM.png

SOLUTION

New second-story porch, landing, & stair system

Screenshot 2026-07-09 at 10.52.08 PM.png

RESULT

Safe access & a durable new outdoor space

Before & After

Existing Conditions

The existing structure was too small, too steep, and did not meet current code requirements. It was also severely deteriorated from years of exposure.

 

During demolition, the structure began coming apart, confirming just how compromised it had become. The wood was extensively rotted, and many of the fasteners had completely rusted away.

Our Assessment

Simply rebuilding the existing structure was not the right solution. The new stairs needed to provide safe, code-compliant access to a second-floor landing approximately 12 feet above grade.
 

To achieve the appropriate number of stairs while maintaining proper rise and run requirements, the layout needed to be redesigned. An additional landing was incorporated into the plan to create a safer and more functional path to the second floor.

The Solution

The deteriorated structure was removed and replaced with a newly constructed second-floor porch, balcony, and stair system designed around the home's existing layout.
 

The new design includes a properly sized stair system and intermediate landing to safely reach the elevated second-floor space while meeting code requirements.
 

For the finished deck surface, we used TimberTech Advanced PVC decking in Castlegate. This lightweight material provides the appearance of natural wood with exceptional durability and is backed by a 50-year warranty.

Project Outcome

The completed project replaced a severely deteriorated and unsafe structure with a new, functional outdoor space designed for long-term performance. The redesigned stairs and landing provide safer, code-compliant access to the second-floor apartment, while the new balcony creates a durable and attractive outdoor living area.

footings_framing.png
stair_stringers.png
Viewfromlanding.png
Finished_Landing.png
Final.png

*Siding to be completed by another contractor.

Material Palette

tt_pvc_castlegate.png

TimberTech Advanced PVC Landmark Collection

Castlegate

TimberTech Castlegate is a 100% PVC decking material that provides the appearance of natural wood while offering exceptional durability and low-maintenance performance. Its lightweight construction makes it particularly well suited for elevated outdoor structures and is backed by a 50-year warranty.

rdi_vinyl_white_edited.png

RDI Finyl Line Vinyl Railing

White

A low-maintenance railing system with a clean, finished appearance. The design features classic vertical balusters and concealed aluminum reinforcement for added strength and long-term durability.

Construction Details

Screenshot 2026-07-09 at 10.35.31 PM.png

Approx. 12' elevated second-floor access

Screenshot 2026-07-09 at 10.35.31 PM.png

Existing structured removed

Screenshot 2026-07-09 at 10.35.31 PM.png

New porch and balcony constructed

Screenshot 2026-07-09 at 10.35.31 PM.png

Redesigned stair configuration

Screenshot 2026-07-09 at 10.35.31 PM.png

Intermediate landing added

Screenshot 2026-07-09 at 10.35.31 PM.png

Code-compliant stair system

Screenshot 2026-07-09 at 10.35.31 PM.png

TimberTech Advanced PVC decking

Screenshot 2026-07-09 at 10.35.31 PM.png

Vinyl railing system

Why This Matters

Exterior stairs need to be properly designed for the height they serve. An undersized or improperly built stair system can create both safety and code issues.

Planning the stair layout and supporting structure together helps create a safer, more durable result.

Planning a Outdoor Structure?

We can evaluate the existing structure and develop a replacement plan that addresses both the condition of the structure and the requirements of the new design.

bottom of page